KMS Institute of Mountain Hazards and Environment,CAS
关于预测人工堆积体侵蚀量的流弃比法 | |
Alternative Title | Estimation of Erosive Quantity of Man-made Deposit |
程尊兰1,2![]() | |
Corresponding Author | 程尊兰 |
2011 | |
Source Publication | 山地学报
![]() |
ISSN | 1008-2768 |
Volume | 29Issue:SPages:59-61 |
Contribution Rank | 1 |
Abstract | 人工堆积体(渣场)在没有采取水土保持措施状况下,侵蚀量的预测方法,目前还有争议。主要有“流弃比法”和“加速侵蚀系数法”。这里重点讨论了流弃比法预测人工堆积体侵蚀量的依据和注意事项。 |
Other Abstract | The erosive quantity of man-made waste deposit is hard to estimate. Apart from the accelerating coefficient of erosion, the often used method uses the estimation of ratios between the flowing quantity and the wasted quantity. This paper discusses the ration method and some problem involved. |
Keyword | 泥石流起动 人工降雨 雨强 雨时 |
Indexed By | 其他 |
Language | 中文 |
Document Type | 期刊论文 |
Identifier | http://ir.imde.ac.cn/handle/131551/23187 |
Collection | 山地学报 山地灾害与地表过程重点实验室 |
Corresponding Author | 程尊兰 |
Affiliation | 1.中国科学院山地灾害与地表过程重点试验室; 2.中国科学院水利部成都山地灾害与环境研究所 |
First Author Affilication | 中国科学院水利部成都山地灾害与环境研究所 |
Corresponding Author Affilication | 中国科学院水利部成都山地灾害与环境研究所 |
Recommended Citation GB/T 7714 | 程尊兰,刘建康,时亮,等. 关于预测人工堆积体侵蚀量的流弃比法[J]. 山地学报,2011,29(S):59-61. |
APA | 程尊兰,刘建康,时亮,&赵鑫.(2011).关于预测人工堆积体侵蚀量的流弃比法.山地学报,29(S),59-61. |
MLA | 程尊兰,et al."关于预测人工堆积体侵蚀量的流弃比法".山地学报 29.S(2011):59-61. |
Files in This Item: | ||||||
File Name/Size | DocType | Version | Access | License | ||
59-61.pdf(438147KB) | 期刊论文 | 出版稿 | 开放获取 | CC BY-NC-SA | View Application Full Text |
Items in the repository are protected by copyright, with all rights reserved, unless otherwise indicated.
Edit Comment