IMHE OpenIR  > 山地灾害与地表过程重点实验室
滑坡设计推力优化计算
Alternative TitleOptimization calculation of design thrust for landslide
陈颖骐1,2; 王全才1
Corresponding Author王全才
2018
Source Publication浙江大学学报. 工学版
ISSN1008-973X
Volume52Issue:7Pages:1320-1328
SubtypeArticle
Contribution Rank1
Abstract针对滑带参数取值与解决常规滑坡设计推力不确定性的问题,在滑带土本构方程的基础上,引入渐变软化段位置函数和规模放大系数反映实际滑带土的时效性.提出基于监测位移确定各点滑带土强度的量化方法,推导考虑桩土耦合作用的不平衡推力改进法.以攀枝花机场某滑坡为例,对不平衡推力改进法与传统不平衡推力法进行对比.结果表明:利用不平衡推力改进法求得的滑坡推力介于传统不平衡推力法的显示解和隐示解之间;随着桩处滑面倾角的增大,抗滑桩推力增大;随着安全系数的增加,利用改进显示法得到的抗滑桩推力较大,利用改进隐示法得到的抗滑桩推力较小.
Other AbstractThe position function and scale magnification coefficient of the gradual softening section were introduced to reflect the timeliness of the actual slip zone soil based on the constitutive equation of the sliding zone aiming at the value of slip belt parameters and the uncertainty of conventional design thrust of landslide.Then the quantization method was proposed based on the displacement monitoring in order to determine the intensity of each point of the sliding area.An imbalance thrust improvement method considering pile-soil coupling interaction was deduced.Taking a landslide in Panzhihua airport as an example,the imbalance thrust improvement method was compared with the traditional imbalance thrust method.Results showed that the landslide thrusts proposed by the imbalance thrust improvement method were between the explicit solution and the implicit solution of the traditional imbalance thrust method.The thrust of anti-slide pile increased with the inclination angle of the sliding surfaces where piles set up.The thrust of the anti-sliding pile obtained by the improved explicit solution was larger with the increase of the safety factor,while that by the modified implicit solution was smaller.
Keyword滑带土 时效性 不平衡推力法 设计推力
DOI10.3785/j.issn.1008-973X.2018.07.012
Indexed ByCSCD ; EI
Language中文
CSCD IDCSCD:6273581
EI Accession NumberAccession number:20183605777768
Citation statistics
Document Type期刊论文
Identifierhttp://ir.imde.ac.cn/handle/131551/23888
Collection山地灾害与地表过程重点实验室
Affiliation1.中国科学院水利部成都山地灾害与环境研究所,中国科学院山地灾害与地表过程重点实验室;
2.中国科学院大学
First Author Affilication中国科学院水利部成都山地灾害与环境研究所
Recommended Citation
GB/T 7714
陈颖骐,王全才. 滑坡设计推力优化计算[J]. 浙江大学学报. 工学版,2018,52(7):1320-1328.
APA 陈颖骐,&王全才.(2018).滑坡设计推力优化计算.浙江大学学报. 工学版,52(7),1320-1328.
MLA 陈颖骐,et al."滑坡设计推力优化计算".浙江大学学报. 工学版 52.7(2018):1320-1328.
Files in This Item:
File Name/Size DocType Version Access License
滑坡设计推力优化计算_陈颖骐.pdf(457KB)期刊论文出版稿开放获取CC BY-NC-SAView Application Full Text
Related Services
Recommend this item
Bookmark
Usage statistics
Export to Endnote
Google Scholar
Similar articles in Google Scholar
[陈颖骐]'s Articles
[王全才]'s Articles
Baidu academic
Similar articles in Baidu academic
[陈颖骐]'s Articles
[王全才]'s Articles
Bing Scholar
Similar articles in Bing Scholar
[陈颖骐]'s Articles
[王全才]'s Articles
Terms of Use
No data!
Social Bookmark/Share
File name: 滑坡设计推力优化计算_陈颖骐.pdf
Format: Adobe PDF
All comments (0)
No comment.
 

Items in the repository are protected by copyright, with all rights reserved, unless otherwise indicated.